Knuchel Farben
Parent company with production and development for the areas of building protection, wood as well as automotive and industrial coatings.
COLORAMA
These are the sales outlets of Knuchel Farben AG throughout Switzerland. Here you can find out more about the range of services and opening hours.

Ferry-boat «Horgen»

The 49.50 m long ferry of the Lake Zurich ferry Horgen Meilen AG was built in 1991 and underwent a comprehensive renovation in 2023

Implementation: 2023 by Shiptec AG

Products used: ECLON PUR Phosphate Primer, COROZINC M, COROPUR NON ABRASIVE LS, COROPUR NON ABRASIVE RHK 12/13, various ECLON PUR ACR top coats

>To the picture gallery


Elevator shaft and foodbridge

In the heart of Lausanne:  Completed installation of a dizzying structure. This involves the scaffolding of an elevator shaft and a footbridge

Implentation: Morand Constructions Métalliques, Stucortec Bex

Product used: ECLAPOX Phosphate Primer whiteECLON EP micaceous iron F-100ECLON PUR DA micaceous iron G102

>To the picture gallery


Marti Technik AG - Push boat

Coating work

 

Implentation: September - Oktober 2023 

Product used: ECLON EP OT Primer, COROPUR NON ABRASIVE LS  

>To the picture gallery


Extension work 

...we are now in the dry - roofing of the area for the collection and delivery of goods

 

Implentation: May 2023 by Fames AG, Niederbipp

Product used: ECLAZINC zinc dust primer, ECLON PUR DS top coat

>To the picture gallery

 

 


Swissgrid - Corrosion protection power poles

Coating work on the truss pylons

 

Implentation: May - October 2023 by Impregna GmbH 

Product used: INDUPLAST ACR 93 micaceous iron RAL 6003

>To the picture gallery


Commercial building in Develier (IMJU)

For the new commercial building, the 1K water-based steel fire protection incl. top coat was used - fire resistance class F/R30

 

Implentation: 2023 by Fire System SA, Bulle

Product used: Nullifire SC803, Nullifire TS816

>To the picture gallery

 

 


Object: Vigier Péry

Coating of the standing tank for waste oil collection (550m2)

Pre-treatment floor blasting Sa 2.5, layer thickness 500-800my

 

Implentation: April 2023 by H. Giger AG

Product used: WBA POX WTB

>To the pciture gallery

 


Object: Wiedag Recycling and Landfill AG

Coating of the fermentation warehouse (350m2) for food waste at room temperature

Substrate: concrete, layer thickness 500-800my, drying time 24h /temp. 50°C

 

Implentation: 2023 by Polyrex Beschichtungstechnik AG 

Product used: Primer WBA POX FG incl. sprinkling with quartz sand, Top coat WBA POX TIB spez 

>To the picture gallery

 


New Eniwa energy center for KSA of Aarau

2 heat/cold storage tanks for the new Eniwa heat center at the Kantonsspital Aarau AG. The storage tanks are each 14 meters high, each weigh 22 tons and have a diameter of 3.5 meters

 

Implentation: 2023 by Arno Stiefenhofer AG , Bonaduz

Products used: COROPUR Phosphate Primer

>To the picture gallery

 

 


EEW Energy from Waste - Saarland 

 80-ton steel structure for the construction of a new steam turbine with hall construction including crane runway

 

Implentation: 2022/2023 by Winterhalter Stahl- und Metallbau GmbH

Produkcts used: COROZINC V zinc dust primer, ECLON HS MONOCOLOR, ECLON PUR DA GLIMMER

>To the picture gallery

 

 


Porsche 356RE

Products used: COROPUR NON ABRASIVE LS  RAL 9005 & 3000 for the chassis and tubular construction

>more information


Zünd Systemtechnik AG, Altstätten

Zünd Digital Cutting System - the perfect cutting system for every application

 

Implementation: InLack AG, 9450 Altstättem

Products used: various ECLAPUR 143 textured paint 

>To the picture gallery

 

 


Customized kitchen

Planning, production and assembly: Oesch Innenausbau AG, Steffisburg

Photographer: Caroline Piasecki

Products used: ECLON PUR primer and spray filler, ECLON PUR ACR textured lack semi-gloss

>To the picture gallery

 

 


Steam boat Lötschberg - Revision Winter 2021 - 2022

Built in 1914, length 56.50 m, width 12.60 m and can accommodate 800 people. 

Design/done by: BLS Schifffahrt AG

Photographer: Christoph Hurni

Products used: COROPUR Phosphate Primer, COROPUR micacseous iron ore, various ECLON PUR ACR top coats

>To the picture gallery

 

 


Dätwyler Schweiz AG, Schattdorf

For the renovation and new building of the company Dätwyler Schweiz AG in Schattdorf, approx. 1.2 tons of 1K water-based steel fire protection were usedt - Intumenscent system/Protection time:F/R60

 

Implementation:  2021 done by TEKO Oberflächentechnik AG, Flüelen

Products used: Nullifire SC803, Nullifire TS816, 

>To the picture gallery

 

 


Walser GmbH, AT-Rankweil 

Implementation: 2021 Coatings for pickup trucks, food trucks, loading areas, delivery vans for bakeries  

Products used: CORODUR Primer reddish, CORODUR SV 90, CORODUR TOP 75/80 (UV- and abrasion resistant topcoat coating)

>To the picture gallery


Pressure pipeline Valais

Coating work on the Nendaz pressure pipeline - moisture-curing products in steel hydraulic engineering for abrasion-resistant long-term corrosion protection.

Products used: COROZINC M Zinc dust primer, COROPUR NON ABRASIVE RAL 7005 & 9002

>To the picture gallery


DS Hohentwiel shines in new splendor

The photographers: Erich Baumann, Peter Lehner, Peter Greber, Theo Schneider,
René Zoller, Renata Verardo vom Fotoklub Klubschule Migros St. Gallen 

www.fotoklub.ch / https://hohentwiel-verein.ch/hohentwiel

Implementation: February - April 2021

Products used: COROPUR NonAbrasive, ECLON HS MONOCOLOR, various ECLON PUR ACR top coats

>To the picture gallery

 

 


Zaugg AG Eggiwil

 

Snow removal from roads, railways, airports and snow slopes

 

Products used: ECLON PUR Phosphate Primer, various ECLON PUR top coats

>To the picture gallery


Moser AG Tipper and vehicle construction

 

Always one charge ahead....

Products used: ECLON PUR Phosphate Primer, various ECLON PUR ACR top coats

>To the picture gallery


von Atzigen AG

Implementation: 2021 Woodchip transport body on Volvo FM460 8x4 

Products used: ECLON EP Washprimer, ECLON PUR Phosphate Primer, various ECLON PUR DS top coats

>To the picture gallery


Nouvelle Comédie Genf - the Theater of the Future

Implementation: 2016 - 2021
Products used: ECLON EP Phosphate Primer, ECLON PUR ACR RAL 9006 &
                                         ECLON PATINA MODERN RAL 9006

> To the picture gallery

 


Water service / City of Lausanne

Implementation: November 2020 done by Entreprise SPI SA 
Products used: COROZINC M, COROPUR NON ABRASIVE RAL 7005, ECLON PUR ACR gloss RAL 5010

> To the picture gallery

 


Lock opening in Lavey

Implementation: 2019
Products used: COROPUR NON ABRASIVE LS

> To the picture gallery

 


Building Silo

Implementation: 2019 by GH SA, Yverdon les Bains
Products used: ECLAPOX Phosphate Primer, ECLON PUR ACR gloss

> To the picture gallery

 


Rack model railway (Museum of Transport Lucerne)

The rack-and-pinion model railway is located in Lucerne's Museum of Transport and is the attraction for young and old.
Design: zb Zentralbahn AG.

Products used: ECLON PUR Phosphate Primer, various ECLON PUR ACR top coats

>To the picture gallery


Ferry-boat «Meilen»

The ferry «Meilen» is the longest ship on Lake Zurich, 60 m long and weighing 380 tons - was put into service in May 2017.

Products used: ECLAPOX Phosphate Primer, ECLON HS MONOCOLOR, COROZINK M, COROPUR NON Abrasive (LS), COROPUR Micaceous iron ore, ECLON EP Micaceous iron ore, various ECLON PUR top coats

>To the picture gallery


MS Saphir (Shiptec AG; Lucerne)

A breath of St. Tropez on Lake Lucerne - A yacht for about 200 people.

Products used: COROZINK M, COROPUR micaceous iron ore, various ECLON PUR top coats

>To the picture gallery


MS St. Gallen (SBS Romanshorn)

The 51,2 m long flagship of Switzerland. Bodensee- Schifffahrt was built in 1967 and will undergo a comprehensive renovation in 2016

Products used: COROZINK M, COROPUR Micaceous iron ore, COROPUR Non Abrasive, various ECLON PUR top coats

>To the picture gallery


Passerelle in the Cantonal Hospital St. Gallen

Due to its size, the new construction was delivered in six components and assembled on site in the summer of 2017. This new double-decker connection is around 125 tonnes and 51 metres long. Double-storeyed, therefore, to separate the paths of patients from those of logistics.

Products used: ECLON HS MONOCOLOR, ECLON PUR DA Mica

>To the picture gallery


CFF Herdern Zurich - 28'000m2

Implentation Taufer AG: 2013/2014 
Products used: ECLAPOX Phosphate PrimerECLON EP Micaceous iron oreECLON PUR DA Mica

> To the picture gallery

 


CFF Passerelle Neuhausen / Rhine Falls

A safe walk to the Rhine Falls; every 30 minutes from the new SBB stop «Neuhausen Rhine Falls», you can walk comfortably and effortlessly over the spectacular steel and concrete structure down to Europe's largest waterfall.

Products used: ECLON HS MONOCOLOR, ECLON PUR DA Mica

> To the picture gallery


Canopy Bern

The striking steel and glass construction, which resembles a footprint, covers 2,500 m² of the Bernese Bahnhofplatz.

Awarded the Prix Acier 2009.

Products used: ECLON EP primer, ECLON PUR top coat

>To the picture gallery


Pressure pipeline Neubrigg (Gommerkraftwerke AG)

Coating work on the Neubrigg pressure pipeline - moisture-curing products in steel hydraulic engineering for abrasion-resistant long-term corrosion protection.

Products used inside: COROZINC M Zinc dust primerCOROPUR NON ABRASIVE, exterior: COROZINC M zinc dust primer, COROPUR micaceous iron ore, COROPUR top coat

>To the picture gallery


Foodbridge Liverpool

The passerelle spans 60 metres at a height of 8 metres. Their angled shape results from the two starting points which are not coordinated with each other. It consists of three parts; the facet-like surface design was created by diagonally interweaving load-bearing, smooth steel panels welded together to form a rigid form and glazed lightweight construction elements. Manufactured in Switzerland, it was transported in three parts to Liverpool, where it was assembled in just one night thanks to a sophisticated assembly plan.

Performance: 2008; Recognition prize: Prix Acier 2009
Products used: ECLON EP zinc dust primer, ECLON EP micaceous iron ore, ECLON PUR top coat
>To the picture gallery

 

 


Zentrum Paul Klee, Bern

1'200 tons of steel were skilfully processed for this idiosyncratic building, created by the Paris-based architect Renzo Piano. The largest of the three «waves» measures 70 m each in depth and width!

Implementation: 2003

Products used: COROPOUR zinc dust primer, ECLON EP micaceous iron ore, ECLON PUR top coat, COROPUR teer 21
>To the picture gallery 


Villa Chardonne

Implementation: 2008 by Zwahlen & Mayr Aigle
Products used: Corrosion protection products

> To the picture gallery